Serving Clients Nationwide
Electrosteel is proud to serve clients with solid dependable pipe across the United States. No job is too big or small for our team to implement. Here are just a few of our latest projects.
- Project Name: Sawmill Road Bridge Water Main
- Location: Waterloo, ON
- Project Description: Electrosteel USA supplied over 400’ of 12” water main for use in an aerial crossing over the Sawmill Road Bridge in Waterloo, ON. The project engineer, GM Blue Plan, specified Electrosteel USA’s Pushlock restraint system due to its flexibility and strength. Electrosteel USA’s zinc coating was also specified making this project one of the first in Canada to use this innovative technology. No doubt Waterloo will enjoy decades (maybe centuries!) of service from this pipe!
- Project Name: Jackson County, Georgia
- Project Description: EUSA is happy to announce the initial delivery of ductile iron pipe to Jackson County, Georgia for the SPLOST 6 – Water Main Extensions – Pleasant Acres project. We are very excited to work with Universal Underground and JCWSA over the coming months to deliver over 29’000 LF of high-quality DIP.
- Project Name: Watsonville, CA System Pipe
- User: City of Watsonville
- Project Description: Electrosteel is proud to work with Watsonville, CA. In December 2019, 252’ of 20” NuBlu and 864’ of 16” NuBlu was shipped to Watsonville to help them continue to grow their system. Pipe was installed by city crews as part of their continuing in-house construction program. NuBlu continues to be Watsonville’s material of choice due to its enhanced corrosion protection capabilities.
- Project Name: East Rocksylvania Ave Water Main Extension
- User: Iowa Falls Utilities
- Distributor: Core and Main
- Project Description: In December of 2019, EUSA supplied 650’ of 6” NuBlu Pushlock DIP to Synergy Contracting for installation via horizontal directional drill (HDD).
- Project Name: Yukon Road Water System Improvement
- User: Ellijay-Gilmer Water and Sewer Authority
- Project Description: In the fall of 2018, Electrosteel USA provided Ellijay-Gilmer County Water and Sewer Authority with 21,120 LF of 8” Class 350 DIP to extend their current system in order to reach new customers.
- Project Name: Ranger Transmission Main
- User: Calhoun Utilities
- Distributor: Calhoun Meter
- Project Description: In early 2019, Electrosteel USA with the help of Calhoun Meter, provided Calhoun Utilities with 27,000 LF of 12” Class 350 DIP.
- Project Name: Hurt Road Water Main Replacement
- User: Cobb County System
- Contractor: D&H Construction
- Project Description: Electrosteel USA is currently providing D&H Construction with 19,000 LF of 12” Class 350 DIP to replace current 6” and 8” water mains for Cobb County Water System.